At 1100 am SS who was resiging today rang me and said he the guys who were supposed to replace 1 of the sliding mirrors replaced the wrong one.
Damn that pissed me off ,he said everything was done including the external conduit .
I turned up shortly afterwards and most of the stuff on the outside was not completed such as mortar covering the timber windows,water in the gutters ,mortar not cleaned etc.
I made a written complaint to the CLO and requested the construction manager to get back to me as to why I was stuffed around.
I have the option of taking a letter of Undertaking but we that in my opinion is not a good option as these are important defects and incompete work ,Iam not waiting 3 months or running around after HO to get them fixed.
Friday, July 30, 2010
Tuesday, July 27, 2010
Monday, July 26, 2010
visited site 26-7-2010 apologise for the photo
I visited site and it seems work is progressing on getting all the items notated at PCI fixed.
I noticed on the outside they have removed the render that was covering the gap for the large timber window ,not the other smaller windows.
stickers were placed where the mortar needs cleaning and quads were used to cover other mortar imperfections in the alfresco.
It seems like the incorrectly cut bricks will be replaced.
Iam visiting the site this arvo to try and get a glimpse of the work on the inside.
I tried posting some photos ,seems like it didnt work I will try again tonight.
I noticed on the outside they have removed the render that was covering the gap for the large timber window ,not the other smaller windows.
stickers were placed where the mortar needs cleaning and quads were used to cover other mortar imperfections in the alfresco.
It seems like the incorrectly cut bricks will be replaced.
Iam visiting the site this arvo to try and get a glimpse of the work on the inside.
I tried posting some photos ,seems like it didnt work I will try again tonight.
Sunday, July 25, 2010
PCI on the 22-7-2010
0900-PCI started 
We went through Alex's list and SS promised to fix all on the list.I had my list which he was very impressed. I never found anything that was not on Alex's list on the inside except things like privacy locks not installed.
SS promised to fix everything on Alex's list and notated this on the completion certificate this was good enough for me.
1115 PCI was completed .The structural defect where the timber windows did not have a gap of 5MM ,SS advised that the render was covering it. I asked him to clean the render (could be a bluff) .He promised to do so by the 29-7-2010.
We went through Alex's list and SS promised to fix all on the list.I had my list which he was very impressed. I never found anything that was not on Alex's list on the inside except things like privacy locks not installed.
SS promised to fix everything on Alex's list and notated this on the completion certificate this was good enough for me.
1115 PCI was completed .The structural defect where the timber windows did not have a gap of 5MM ,SS advised that the render was covering it. I asked him to clean the render (could be a bluff) .He promised to do so by the 29-7-2010.
Tuesday, July 6, 2010
7-7-2010
Almost there ! Yes carpets  installed ,showers, Range hood ,door fittings 
We are waiting on the Rendering ,front door to be installed
Iam freting about PCI . I have got ALex from Urban Inspections to come in on the 14th and we will do our own inspection on the 15th.
We are waiting on the Rendering ,front door to be installed
Iam freting about PCI . I have got ALex from Urban Inspections to come in on the 14th and we will do our own inspection on the 15th.